subject
Physics, 05.08.2019 17:30 neariah24

Aleaky 10-kg bucket is lifted from the ground to a height of 10 m at a constant speed with a rope that weighs 0.9 kg/m. initially the bucket contains 30 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 10-m level. find the work done. (use 9.8 m/s2 for g.) show how to approximate the required work by a riemann sum. (let x be the height in meters above the ground. enter xi* as xi.)

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 14:50
Ingrid wrote the hypothesis below. if the temperature of a liquid increases, the density of the liquid decreases because the particles move farther apart. what are the variables in her hypothesis?
Answers: 3
question
Physics, 21.06.2019 18:00
Acommercial passenger jet can travel up to 970 km/hr at an altitude of 30,000 feet. at this speed, how long will it take the jet to travel 1,865 kilometers? a. 2.3 hrs b. 1.9 hrs c. 1.7 hrs d. 1.5 hrs
Answers: 1
question
Physics, 22.06.2019 05:20
A3.9 g aluminum foil ball with a charge of +4.1×10−9 c is suspended on a string in a uniform horizontal e⃗ field. the string deviates to the right and makes an angle of 30∘ with the vertical. part a part complete what information about the e⃗ field can you determine for this situation? what information about the field can you determine for this situation? only the magnitude of e⃗ only the direction of e⃗ both the magnitude and the direction of e⃗ none of the above previous answers correct part b determine the magnitude of the electric field. express your answer with the appropriate units. e e = nothing nothing request answer part c determine the direction of the electric field. determine the direction of the electric field. to the right to the left away from you toward you
Answers: 3
question
Physics, 22.06.2019 12:30
As part of your daily workout, you lie on your back and push with your feet against a platform attached to two stiff springs arranged side by side so that they are parallel to each other. when you push the platform, you compress the springs. you do an amount of work of 79.0 j when you compress the springs a distance of 0.230 m from their uncompressed length. (a) what magnitude of force must you apply to hold the platform in this position? (b)how much additional work must you do to move the platform a distance 0.230 m farther? (c) what maximum force must you apply to move the platform a distance 0.230 m farther?
Answers: 1
You know the right answer?
Aleaky 10-kg bucket is lifted from the ground to a height of 10 m at a constant speed with a rope th...
Questions
question
Geography, 21.08.2019 22:20
Questions on the website: 13722362