subject
Physics, 22.06.2019 17:00 miya214

The chart shows the costs and shipping times for materials that a company needs to build a new product. which describes the best trade-off if the company needs to start building their product within the next two years? they should order the domestic materials because it is always best to choose the fastest shipping time. they should order the imported materials because it is always best to choose the lowest cost for materials. since the shipping time is longer, they should order the domestic materials because the additional cost is worth it to get the materials in time. even though the shipping time is longer, they should order the imported materials because they are less expensive and should arrive in plenty of time to build the product.

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 23:30
In which of the following cases is work being done on an object? question 2 options: pulling a trailer up a hill carrying a box down a corridor suspending a heavy weight with a strong chain pushing against a locked door
Answers: 2
question
Physics, 22.06.2019 00:30
What is the acceleration of a spaceship that is initially at rest and then speeds up to 220 m/s in 20 seconds
Answers: 1
question
Physics, 22.06.2019 03:30
Acoyote chasing a rabbit is moving 8.00 m/s due east at one moment and 8.80 m/s due south 4.25 s later. let the x axis point due east and the y axis point due north. find the direction of the coyote's average acceleration during that time.
Answers: 1
question
Physics, 22.06.2019 04:30
In a system, when potential energy decreases, then entropy also decreases. true false
Answers: 3
You know the right answer?
The chart shows the costs and shipping times for materials that a company needs to build a new produ...
Questions
question
Mathematics, 14.08.2020 01:01
question
Mathematics, 14.08.2020 01:01
question
Mathematics, 14.08.2020 01:01
question
Mathematics, 14.08.2020 01:01
question
History, 14.08.2020 01:01
Questions on the website: 13722362