Your boss tells you that she needs a decision by the end of the day about the machine you want to purchase for your new operation. you have four options, and your boss reminds you to be as cost-efficient as possible but that she also wants the best efficiency. which is your best option?
l option 1: this $5,000 machine is supplied energy at a rate of 1,900 w and does useful work at a rate
of 1,786 w.
l option 2: this $4,500 machine is supplied energy at a rate of 1,450 w and does useful work at a rate
of 1,300 w.
l option 3: this $4,750 machine is supplied energy at a rate of 1950 w and does useful work at a rate
of 1833 w.
l option 4: this $4,750 machine is supplied energy at a rate of 2,000 w and does useful work at a rate
of 1,822 w.
a. option 3
b. option 2
c. option 4
d. option 1
Answers: 1
Physics, 22.06.2019 14:40
What is the orbital period of a spacecraft in a low orbit near the surface of mars? the radius of mars is 3.4×106m.
Answers: 2
Physics, 22.06.2019 21:30
What describes the formation of horizon b? a. forms at the surface b. features parent material c. undergoes the most change d. forms due to decomposed material i think the answer is c. undergoes the most change
Answers: 1
Physics, 22.06.2019 23:00
A6.0-μf air-filled capacitor is connected across a 100-v voltage source. after the source fully charges the capacitor, the capacitor is immersed in transformer oil (of dielectric constant 4.5). how much additional charge flows from the voltage source, which remained connected during the process?
Answers: 1
Your boss tells you that she needs a decision by the end of the day about the machine you want to pu...
Computers and Technology, 07.06.2020 02:57
Mathematics, 07.06.2020 02:57
Mathematics, 07.06.2020 02:57
History, 07.06.2020 02:57
Health, 07.06.2020 02:57
Mathematics, 07.06.2020 02:57
Computers and Technology, 07.06.2020 02:57
English, 07.06.2020 02:57