subject
Mathematics, 23.07.2019 15:00 eggoysters

31 workers are working on a construction site. 5 more workers work for company a than for company b. how many workers work for each company?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Mickey needs to cut pieces of ribbon that are each 1 meter long tie onto balloons. if he has 8 pieces of ribbon that are each 1 dekameter long. how many 1 meter pieces of ribbon can he cut
Answers: 1
question
Mathematics, 21.06.2019 22:20
The school track has eight lanes. each lane is 1.25 meters wide. the arc at each end of the track is 180. the distance of the home straight and the radii for the arcs in the 1st 4 lanes are given. s=85m r1=36.5m r2=37.75m r3=39m r4=40.25m part one: find the radii of lanes 5 through 8 of the track. show your work. part two: if max ran around lane one, how far did he run? show your work and explain your solution. part three: max wants to run a total of three laps around the track, choose two additional lanes (2-8) for him to run and find the distance around those two lanes. show your work and round to the hundredths. part 4: based on your lane choices in part three, what was the total distance max ran in the three laps around the track?
Answers: 2
question
Mathematics, 22.06.2019 00:30
If it 8 inch candle burns at 7/10 inch per hour and a 6 inch candle burns at 1/5 inch per hour after how many hours would both candles be the same height
Answers: 1
question
Mathematics, 22.06.2019 03:30
One angle of a linear pair is 10 more than two-thirds the other angle. find the measure of both angles.
Answers: 1
You know the right answer?
31 workers are working on a construction site. 5 more workers work for company a than for company b....
Questions
question
Mathematics, 27.01.2020 21:31
question
Mathematics, 27.01.2020 21:31
question
Mathematics, 27.01.2020 21:31
Questions on the website: 13722360