subject
Mathematics, 24.07.2019 06:00 shawn379

In an assignment method problem, if it takes abe 3 hours to build a birdhouse and 4 hours for a doghouse, while betty takes 4 hours for a birdhouse and 3 hours for a doghouse, what is the reduced cost (in hours) of assigning abe to build the doghouse? 0 hours 1 hour 2 hours 3 hours 4 hours

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
The annual snowfall in a town has a mean of 38 inches and a standard deviation of 10 inches. last year there were 63 inches of snow. find the number of standard deviations from the mean that is, rounded to two decimal places. 0.44 standard deviations below the mean 2.50 standard deviations below the mean 0.44 standard deviations above the mean 2.50 standard deviations above the mean
Answers: 3
question
Mathematics, 21.06.2019 23:30
Written as a simplified polynomial in standard form, what is the result when (2x+8)^2(2x+8) 2 is subtracted from 8x^2-38x 2 −3?
Answers: 3
question
Mathematics, 22.06.2019 00:00
An equation in slope-intersept form the lines that passes thought (-8,1) and is perpindicular to the y=2x-17.
Answers: 1
question
Mathematics, 22.06.2019 01:30
The diameter of the moon is about 3500 km. approximate the surface area of the moon using the formula for the surface area of a sphere, s = 4? r^2. write your answer in scientific notation.
Answers: 3
You know the right answer?
In an assignment method problem, if it takes abe 3 hours to build a birdhouse and 4 hours for a dogh...
Questions
question
Mathematics, 07.01.2021 06:20
question
Mathematics, 07.01.2021 06:20
question
Geography, 07.01.2021 06:20
question
English, 07.01.2021 06:20
Questions on the website: 13722363