subject
Mathematics, 28.07.2019 21:00 cece9080

Working together shawn and hector can instal a tile floor in 6 hours. it would take shawn 9 hours to do the job alone. what is the value of r, the part of the tile that hector could install in 1 hour? a. 1/18 b. 1/9 c. 1/3 d. 2/3

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
What is the standard deviation of the following data set rounded to the nearest tenth? 3, 17, 18, 15, 12, 21, 9
Answers: 2
question
Mathematics, 21.06.2019 17:50
On a string instrument, the length of a string varies inversely as the frequency of its vibrations. an 11-inch string has a frequency of 400 cylces per second. find the frequency of a 10-icnch string.
Answers: 2
question
Mathematics, 21.06.2019 23:30
Hich equation can pair with x + 2y = 5 to create an inconsistent system? 2x + 4y = 3 5x + 2y = 3 6x + 12y = 30 3x + 4y = 8
Answers: 3
question
Mathematics, 22.06.2019 02:30
Why does the shape of the distribution of the weights of russet potatoes tend to be symmetrical?
Answers: 3
You know the right answer?
Working together shawn and hector can instal a tile floor in 6 hours. it would take shawn 9 hours to...
Questions
question
Social Studies, 18.05.2021 18:40
question
Mathematics, 18.05.2021 18:40
question
Mathematics, 18.05.2021 18:40
question
English, 18.05.2021 18:40
Questions on the website: 13722363