Mathematics, 01.08.2019 02:30 jcutler2751
The first team of workers received 50 kg of cement less than the second team. for every hour of work the first team was using 150 kg of cement, while the second team was using 200 kg. in three hours the first team had 1.5 times as much remaining cement as the second team. how much cement was delivered to each team of workers?
Answers: 1
Mathematics, 21.06.2019 18:00
A. 90 degrees b. 45 degrees c. 30 degrees d. 120 degrees
Answers: 2
Mathematics, 21.06.2019 20:30
Venita is sewing new curtains. the table below shows the relationship between the number of stitches in a row and the length ofthe row.sewingnumber of stitches length (cm)51 131532024306what is the relationship between the number of stitches and the length? othe number of stitches istimes the length.o. the number of stitches is 3 times the length.
Answers: 2
Mathematics, 21.06.2019 21:50
Ab and bc are tangent to circle d. find x is ab = 3x + 8 and bc = 26. find x
Answers: 1
The first team of workers received 50 kg of cement less than the second team. for every hour of work...
Mathematics, 17.09.2020 04:01
Biology, 17.09.2020 04:01
English, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Chemistry, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Biology, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01
Mathematics, 17.09.2020 04:01