Mathematics, 22.10.2019 16:00 brandontru
In our class, our class teacher gave us a project to complete in 15 days. if the teacher assigned 4 consecutive projects, how many days will you have to complete the projects?
Answers: 2
Mathematics, 21.06.2019 19:50
Prove (a) cosh2(x) − sinh2(x) = 1 and (b) 1 − tanh 2(x) = sech 2(x). solution (a) cosh2(x) − sinh2(x) = ex + e−x 2 2 − 2 = e2x + 2 + e−2x 4 − = 4 = . (b) we start with the identity proved in part (a): cosh2(x) − sinh2(x) = 1. if we divide both sides by cosh2(x), we get 1 − sinh2(x) cosh2(x) = 1 or 1 − tanh 2(x) = .
Answers: 3
Mathematics, 21.06.2019 20:30
Write the summation to estimate the area under the curve y = 1 + x2 from x = -1 to x = 2 using 3 rectangles and right endpoints
Answers: 1
Mathematics, 21.06.2019 21:30
*let m∠cob = 50°30’, m∠aob = 70° and m∠aoc = 20°30’. could point c be in the interior of ∠aob? why? a. point c could be the interior of aob but it is not the only case b. point c is the interior of aob c. point c is not the interior of aob d. the given is not possible for the plane geometry answer
Answers: 1
In our class, our class teacher gave us a project to complete in 15 days. if the teacher assigned 4...
History, 25.09.2019 12:30
Mathematics, 25.09.2019 12:30
Mathematics, 25.09.2019 12:30
Mathematics, 25.09.2019 12:30
Mathematics, 25.09.2019 12:30
Mathematics, 25.09.2019 12:30
Computers and Technology, 25.09.2019 12:30
English, 25.09.2019 12:30
English, 25.09.2019 12:30
Physics, 25.09.2019 12:30
Mathematics, 25.09.2019 12:30
History, 25.09.2019 12:30
History, 25.09.2019 12:30