subject
Mathematics, 31.07.2019 07:00 MissSusan183

The donaldson furniture company produces three types of rocking chairs: the children's model, the standard model, and the executive model. each chair is made in three stages: cutting, construction, and finishing. stage children's standard executive cutting 5 hr 4 hr 7 hr construction 3 hr 2 hr 5 hr finishing 2 hr 2 hr 4 hr the time needed for each stage of each chair is given in the chart. during a specific week the company has available a maximum of 152152 hours for cutting, 9292 hours for construction, and 7474 hours for finishing. determine how many of each type of chair the company should make to be operating at full capacity.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
The table represents a linear function. what is the slope of the function? –6 –4 4 6
Answers: 3
question
Mathematics, 21.06.2019 21:00
Circle a has a diameter of 7 inches, a circumference of 21.98 inches, and an area of 38.465 square inches. the diameter of circle b is 6 inches, the circumference is 18.84 inches, and the area is 28.26 square inches. part a: using the formula for circumference, solve for the value of pi for each circle. (4 points) part b: use the formula for area and solve for the value of pi for each circle. (4 points)
Answers: 2
question
Mathematics, 21.06.2019 21:00
The measure of angle 0 is 600 degrees
Answers: 1
question
Mathematics, 22.06.2019 00:10
Of of at a : $6, $8, $7, $6, $5, $7, $5, $7, $6, $28, $30 is?ato .ato .ato .ato .
Answers: 3
You know the right answer?
The donaldson furniture company produces three types of rocking chairs: the children's model, the s...
Questions
question
Mathematics, 27.10.2020 22:10
question
History, 27.10.2020 22:10
question
Mathematics, 27.10.2020 22:10
question
English, 27.10.2020 22:10
Questions on the website: 13722367