Mathematics, 21.07.2019 05:50 jkirby29
Aproduction line is to be designed for a job with three tasks. the task times are 0.4 minutes, 1.2 minutes, and 0.5 minutes. the maximum cycle time in minutes is:
Answers: 1
Mathematics, 21.06.2019 16:00
If myesha works overtime, she gets paid "time and a half" for every hour she works. in other words, for every hour over 40 hours myesha works each week, she gets her hourly pay plus half her hourly pay. what is myesha's pay per hour when she works overtime?
Answers: 1
Mathematics, 21.06.2019 16:00
Which term best describes the association between variables a and b? no association a negative linear association a positive linear association a nonlinear association a scatterplot with an x axis labeled, variable a from zero to ten in increments of two and the y axis labeled, variable b from zero to one hundred forty in increments of twenty with fifteen points in a positive trend.
Answers: 2
Mathematics, 21.06.2019 19:20
1- what do you think the product of a nonzero rational number and an irrational number is? is it rational or irrational? make use of variables, the closure property of integers, and possibly a proof by contradiction to prove your hypothesis.2- why do we have to specify that the rational number must be nonzero when we determine what the product of a nonzero rational number and an irrational number is? if the rational number were 0, would it give us the same result we found in the first question?
Answers: 2
Mathematics, 21.06.2019 20:00
Afamily has five members. a mom, a dad, two sisters, & a brother. the family lines up single file. what is the probabillity that the mom is at the front of the line
Answers: 1
Aproduction line is to be designed for a job with three tasks. the task times are 0.4 minutes, 1.2 m...
Social Studies, 30.11.2020 22:10
Physics, 30.11.2020 22:10
Advanced Placement (AP), 30.11.2020 22:10