Mathematics, 12.07.2019 05:00 londonval
If it takes 3 days for 10 workers to finish building one house, how many days will it take 15 workers to finish 4 houses?
Answers: 1
Mathematics, 21.06.2019 21:00
Which line is parallel to the line that passes through the points (2, –5) and (–4, 1) a. y=-x+5 b. y=-2/3x+3 c. y=2/3x-2 d. y=x+5
Answers: 2
Mathematics, 22.06.2019 01:40
Ahigh-altitude spherical weather balloon expands as it rises, due to the drop in atmospheric pressure. suppose that the radius r increases at the rate of 0.02 inches per second, and that r = 36 inches at time t = 0. determine the equation that models the volume v of the balloon at time t, and find the volume when t = 360 seconds. v(t) = 4Ď€(0.02t)2; 651.44 in3 v(t) = 4Ď€(36 + 0.02t)2; 1,694,397.14 in3 v(t) = four pi times the product of zero point zero two and t to the third power divided by three.; 4,690.37 in3 v(t) = four pi times the quantity of thirty six plus zero point zero two t to the third power divided by three.; 337,706.83 in3
Answers: 1
If it takes 3 days for 10 workers to finish building one house, how many days will it take 15 worker...
Mathematics, 12.10.2020 19:01
History, 12.10.2020 19:01
Mathematics, 12.10.2020 19:01
Mathematics, 12.10.2020 19:01
Computers and Technology, 12.10.2020 19:01
Biology, 12.10.2020 19:01
Biology, 12.10.2020 19:01
History, 12.10.2020 19:01
Mathematics, 12.10.2020 19:01