subject
Mathematics, 23.09.2019 10:00 prettygirl1053473

Write the definition of collinear points as a conditional statement

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 23:00
Each of the following data sets has a mean of x = 10. (i) 8 9 10 11 12 (ii) 7 9 10 11 13 (iii) 7 8 10 12 13 (a) without doing any computations, order the data sets according to increasing value of standard deviations. (i), (iii), (ii) (ii), (i), (iii) (iii), (i), (ii) (iii), (ii), (i) (i), (ii), (iii) (ii), (iii), (i) (b) why do you expect the difference in standard deviations between data sets (i) and (ii) to be greater than the difference in standard deviations between data sets (ii) and (iii)? hint: consider how much the data in the respective sets differ from the mean. the data change between data sets (i) and (ii) increased the squared difference îł(x - x)2 by more than data sets (ii) and (iii). the data change between data sets (ii) and (iii) increased the squared difference îł(x - x)2 by more than data sets (i) and (ii). the data change between data sets (i) and (ii) decreased the squared difference îł(x - x)2 by more than data sets (ii) and (iii). none of the above
Answers: 2
question
Mathematics, 22.06.2019 01:00
Arrange the steps to solve this system of linear equations in the correct sequence. x + y = -2 2x – 3y = -9 tiles subtract 3x + 3y = -6 (obtained in step 1) from 2x – 3y = -9 (given) to solve for x. substitute the value of x in the first equation (x + y = -2) to get y = 1. the solution for the system of equations is (-3, 1). x = -15 the solution for the system of equations is (-15, 13). add 3x + 3y = -6 (obtained in step 1) to 2x – 3y = -9 (given), and solve for x. x = -3 substitute the value of x in the first equation (x + y = -2) to get y = 13. multiply the first equation by 3: 3(x + y) = 3(-2) 3x + 3y = -6.
Answers: 1
question
Mathematics, 22.06.2019 02:40
An oil exploration company currently has two active projects, one in asia and the other in europe. let a be the event that the asian project is successful and b be the event that the european project is successful. suppose that a and b are independent events with p(a) = 0.2 and p(b) = 0.8. (a) if the asian project is not successful, what is the probability that the european project is also not successful? (b) what is the probability that at least one of the two projects will be successful? (c) given that at least one of the two projects is successful, what is the probability that only the asian project is successful? (round your answer to three decimal places.)
Answers: 3
question
Mathematics, 22.06.2019 02:40
Find the sum of the given arithmetic series. 24 + 17 + 10 + 3 + + (–39)
Answers: 3
You know the right answer?
Write the definition of collinear points as a conditional statement...
Questions
question
Mathematics, 24.02.2021 15:10
Questions on the website: 13722367