subject
Mathematics, 01.07.2019 15:40 cameronbeaugh

Aconstruction company needs to remove 3 1/6 tons of dirt from a construction site. they can remove 5/8 tons of dirt each hour. what is the total number of hours it will take to remove the dirt?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:20
What is the point-slope form of the equation for the line with a slope of -2 that passes through (1,4)?
Answers: 1
question
Mathematics, 21.06.2019 23:00
Divide. –4.2 ÷ 6 = a –0.7 b 0.7 c –7 d 7 me
Answers: 2
question
Mathematics, 21.06.2019 23:30
The perimeter of an equilateral triangle is 4 cm more than the perimeter of a square and the length of a side of the triangle is 8 cm more than the length of a side of the aware. find the length of a side of the equilateral triangle
Answers: 1
question
Mathematics, 22.06.2019 02:30
Drag the tiles to the boxes to form correct pairs. not all tiles will be used. match the circle equations in general form with their corresponding equations
Answers: 3
You know the right answer?
Aconstruction company needs to remove 3 1/6 tons of dirt from a construction site. they can remove 5...
Questions
question
History, 23.10.2020 02:01
question
Geography, 23.10.2020 02:01
question
Mathematics, 23.10.2020 02:01
question
Chemistry, 23.10.2020 02:01
Questions on the website: 13722367