subject
Mathematics, 12.03.2022 22:30 cbelew0001ouje4i

productivity can be measured in a variety of ways, such as by labor, capital, energy, material, usage, and so. at nodern lumber inc , art bintley, president and producer of apple gratea sold to grower, has been able, with his current equipment to produce 240 crates per 100 logs. he currently purchase 100 logs per day, and each log require 3 labor- hours to process. he believes that he can hire a professional buyers who can buy a better - quality log at the same cost. if this is the case, he can increase his product production to 260 crates per 100 logs. his labor- hour will increase by 8 hours a day. what will be impact on productivity ( measure in crates per labor "-hour)" if the buyer it hired?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Solve the equation using the zero-product property. -3n(7n - 5) = 0 a. 0, -5/7 b. -1/3, -5/7 c. -1/3, 5/7 d. 0, 5/7
Answers: 2
question
Mathematics, 21.06.2019 19:00
Aprojectile is thrown upward so that its distance above the ground after t seconds is given by the function h(t) = -16t2 + 704t. after how many seconds does the projectile take to reach its maximum height?
Answers: 1
question
Mathematics, 21.06.2019 19:30
Asurvey of 2,000 doctors showed that an average of 3 out of 5 doctors use brand x aspirin.how many doctors use brand x aspirin
Answers: 1
question
Mathematics, 21.06.2019 23:00
The areas of two similar triangles are 72dm2 and 50dm2. the sum of their perimeters is 226dm. what is the perimeter of each of these triangles?
Answers: 1
You know the right answer?
productivity can be measured in a variety of ways, such as by labor, capital, energy, material, usag...
Questions
Questions on the website: 13722363