subject
Mathematics, 03.02.2022 21:50 dmoore222

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, can the company build 60 child bikes and 6 adult bikes in a week? (1 point)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Sarah used her calculator to find sin 125 degrees. she wrote down sin sin125 degrees.57. how could sarah recognize that her answer is incorrect?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Add the fractions and simplify 1/2+ 1/3
Answers: 2
question
Mathematics, 21.06.2019 20:00
What are the digits that repeat in the smallest sequence of repeating digits in the decimal equivalent of 24/11?
Answers: 1
question
Mathematics, 21.06.2019 21:30
The measures of the legs of a right triangle are 15m and 20m . what is the length of the hypotenuse
Answers: 1
You know the right answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...
Questions
question
Computers and Technology, 15.09.2021 03:10
question
Mathematics, 15.09.2021 03:20
Questions on the website: 13722367