A special drill is used at a construction site to dig holes. A hole is dug to a depth of 2.75 feet when the drill hits rock. The progress slows to 5/6 feet per hour of digging. The depth of the hole must be at least 10 1/2 feet by the end of the day to stay on schedule. What is the minimum amount of time the drill must continue at its present rate to complete the hole on schedule? Select from the drop-down menus to correctly complete the statement.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
The perimeter of a stage is 116 feet. it is 17 feet wide. how long is it?
Answers: 1
question
Mathematics, 21.06.2019 18:00
How many glue sticks are in a basket containing 96 scissors, if the ratio of glue sticks to scissors is 19 to 57.
Answers: 1
question
Mathematics, 21.06.2019 21:00
Which of the functions graphed below has a removable discontinuity?
Answers: 2
question
Mathematics, 21.06.2019 22:40
If f(x) = 3x2 - 2x+4 and g(x) = 5x + 6x - 8, find (f-g)(x).
Answers: 1
You know the right answer?
A special drill is used at a construction site to dig holes. A hole is dug to a depth of 2.75 feet w...