subject
Mathematics, 07.12.2021 01:50 kellysmith45

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, can the company build 10 child bikes and 12 adult bikes in a week (1 point) No, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 No, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100 Yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 Yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Use the function nest to evaluate p(x) = 1 + x + · · · + x50 at x = 1.00001. (use the matlab ones command to save typing.) find the error of the computation by comparing with the equivalent expression q(x) = (x51 − 1)/(x − 1).
Answers: 3
question
Mathematics, 21.06.2019 17:10
Determine whether the points (–3,–6) and (2,–8) are in the solution set of the system of inequalities below. x ? –3 y < 5? 3x + 2 a. the point (–3,–6) is not in the solution set, and the point (2,–8) is in the solution set. b. neither of the points is in the solution set. c. the point (–3,–6) is in the solution set, and the point (2,–8) is not in the solution set. d. both points are in the solution set.
Answers: 3
question
Mathematics, 21.06.2019 18:00
Write an equation for the function that includes the points (1,4/5) and (2,2/3)
Answers: 1
question
Mathematics, 21.06.2019 23:20
The cost of turkey is directly proportional to its weight. if a 12-pount turkey costs $27, how much does a 13-pound turkey cost? a. $33.75 b. $36.00 c. $31.00 d. $32.50
Answers: 1
You know the right answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...
Questions
question
Mathematics, 07.11.2020 05:20
question
Computers and Technology, 07.11.2020 05:20
question
Mathematics, 07.11.2020 05:20
Questions on the website: 13722363