subject
Mathematics, 01.12.2021 19:00 snowflakekitty001

Suppose that a project manager tested the strength of one tile out of a batch of 3,000 to be used on a building. This one sample measurement was compared with the design specification and, in this case, the sampled tile's strength exceeded that of the specification. On this basis, the project manager accepted the tile shipment. If the sampled tile was defective (with a strength less than the specification), the project manager would have rejected the lot. Required:
a. What is the probability that ninety percent of the tiles are substandard, even though the project manager's sample gave a satisfactory result?
b. Sketch out the operating characteristic curve for this sampling plan as a function of the actual fraction of defective tiles.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:50
Which of the following is the equation that says that the product of a number and ten is equal to 20 percent of that number ? a) 10n= 2.0n b) 10+n=.20n c) n+ .20n=10 d) 10n=0.20n
Answers: 1
question
Mathematics, 21.06.2019 18:00
Name each raycalculation tip: in ray "ab", a is the endpoint of the ray.
Answers: 2
question
Mathematics, 21.06.2019 23:50
Determine the area of a triangle with (see picture below)
Answers: 1
question
Mathematics, 22.06.2019 00:00
Zahra runs a 500-meter race at a constant speed. which graph shows her distance from the finish line during the race?
Answers: 1
You know the right answer?
Suppose that a project manager tested the strength of one tile out of a batch of 3,000 to be used on...
Questions
question
Health, 18.09.2019 22:00
Questions on the website: 13722363