subject
Mathematics, 22.11.2021 20:40 jazlynreyes

Suppose a furniture builder has two models of a bookcase: standard and artisan. The standard model requires 5 hours to assemble and 12 hours for finishing touches. The artisan model requires
2 hours to assemble and 6 hours for finishing touches. Based on their current staffing, they can
manage a maximum number of assembly hours available is 50 per day, and the maximum number
of finishing hours available is 132 per day.
Let x = the number of standard model bookcases produced per day and y = the number of artisan
model bookcases produced per day.
Write the system of inequalities that represents the maximum number of bookcases that can be
produced in one day.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
The art class is planning to paint a mural on an outside wall. this figure is a scale drawing of the wall. width: 11 in length: 28 in unit rate: 1.5 ft per in. write the ratio of the area of the drawing to the area of the actual mural. write your answer as a unit rate. show that this unit rate is equal to the square of the unit rate 1.5 ft per in
Answers: 1
question
Mathematics, 21.06.2019 22:10
Rationalize the denominator- 12x/√x-10
Answers: 1
question
Mathematics, 21.06.2019 22:40
Select the point that is a solution to the system of inequalities. y< =-x+3 y=x^(2)-3x
Answers: 3
question
Mathematics, 21.06.2019 23:20
Which equation can be solved to find x the measure of jk in the apex
Answers: 3
You know the right answer?
Suppose a furniture builder has two models of a bookcase: standard and artisan. The standard model...
Questions
Questions on the website: 13722363