Mathematics, 11.11.2021 14:00 vm204618
The cost to run Machine 1 for an hour is $2. During that
hour, Machine 1 produces 240 bolts and 100 nuts. The cost
to run Machine 2 for an hour is $2.40. During that hour,
Machine 2 produces 160 bolts and 160 nuts. With a combined
running time of no more than 30 hours, how long should
each machine run to produce an order of at least 2080 bolts
and 1520 nuts at the minimum operating cost?
this is applications of linear programming
Answers: 1
Mathematics, 21.06.2019 17:00
When you are making a circle graph by hand, how do you convert a number for a part into its corresponding angle measure in the circle graph? when you are making a circle graph by hand, what should you do if one of your angle measures is greater than 180ยฐ?
Answers: 2
Mathematics, 21.06.2019 20:30
Aswimming pool measures 22ft by 12ft and is 4ft deep. if the pool is being filled at 2.5 cubic ft per minute, how long will it take to fill the pool?
Answers: 1
Mathematics, 21.06.2019 22:30
Varies inversely with x. if y=8.5 when x=-1 find x when y=-1
Answers: 1
Mathematics, 21.06.2019 23:30
Atown has a population of 17000 and grows at 2.5% every year. to the nearest year, how long will it be until the population will reach 19600?
Answers: 1
The cost to run Machine 1 for an hour is $2. During that
hour, Machine 1 produces 240 bolts and 10...
Computers and Technology, 11.03.2020 17:08
Computers and Technology, 11.03.2020 17:08
Computers and Technology, 11.03.2020 17:08
Mathematics, 11.03.2020 17:08