subject
Mathematics, 20.10.2021 08:30 kittycatwaffels

Un edificio es construido por una cuadrilla de 15 albañiles en 200 días. ¿Cuántos días necesitarán para poder terminar el trabajo 12 albañiles?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
The measure of an angle is 117°. what is the measure of a supplementary angle?
Answers: 2
question
Mathematics, 22.06.2019 00:20
20 ! need ! which exponential function is represented by the table? f(x) = 0.2(0.5x)f(x) = 0.5(5x)f(x) = 0.5(0.2x)f(x) = 0.2(0.2x)
Answers: 1
question
Mathematics, 22.06.2019 03:00
Solve 2x − 1 = 11 for x using the change of base formula log base b of y equals log y over log b.
Answers: 3
question
Mathematics, 22.06.2019 03:10
What is the equation of the line that passes through (-3, -1) and has a slope of 2/5 ? put your answer in slope-intercept form. a y= 2/5x+1/5 b y=2/5x-1/5 c y=-2/5x-1/5
Answers: 2
You know the right answer?
Un edificio es construido por una cuadrilla de 15 albañiles en 200 días. ¿Cuántos días necesitarán p...
Questions
question
Mathematics, 10.08.2021 04:50
Questions on the website: 13722367