Setup time on a certain production machine is 2.0 hr. Batch size is 60 parts, and operation cycle time is 2.0 min. Parts are processes sequentially. The reliability of this machine is characterized by a mean time between failures of 40 hr and a mean time to repair of 5 hr. Taking into account the availability of the machine, the average hourly production rate is closest to: a. 14 pc/hr b. 11 pc/hr c. 12 pc/hr d. 15 pc/hr e. 13 pc/hr
Answers: 3
Mathematics, 21.06.2019 16:30
Diana is painting statues she has 7/8 of a liter of paint each statue requires 1/20 of a liter of paint how many statues can she paint?
Answers: 1
Mathematics, 21.06.2019 18:30
The monetary value earned for selling goods or services to customers is called a.) revenue b.) assets c.) money d.) accounting
Answers: 2
Mathematics, 21.06.2019 21:30
Three friends went on a road trip from phoenix, az, to san diego, ca. mark drove 50 percent of the distance. jason drove 1/8 of the distance. andy drove the remainder of the distance. 1. andy thinks he drove 1/4 of the distance from phoenix, az, to san diego, ca. is andy correct? 2. the distance from phoenix, az, to san diego, ca, is 360 miles. how many miles did each person drive? 3. solve the problem. what is the answer in total?
Answers: 3
Setup time on a certain production machine is 2.0 hr. Batch size is 60 parts, and operation cycle ti...
Spanish, 28.11.2019 17:31
English, 28.11.2019 17:31
Mathematics, 28.11.2019 17:31
Chemistry, 28.11.2019 17:31
Mathematics, 28.11.2019 17:31
Mathematics, 28.11.2019 17:31
Geography, 28.11.2019 17:31
History, 28.11.2019 17:31