subject
Mathematics, 27.09.2021 14:00 aisha82

3. The Fine Threads Company produces sleeveless and regular t-shirts. It takes 1 hour to produce each sleeveless t-shirt and 1.5 hours to produce each regular t-shirt. The company has a total of 975 hours of production time
available. Due to demand, the total number of shirts produced in a week should not exceed 800.
a. Would it be feasible for Fine Threads to produce 400 sleeveless and 400 regular t-shirts each week?
Justify your answer.
b. Write an inequality that expresses the constraint on production time.
c. Write an inequality that expresses the constraint on demand for shirts.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 22.06.2019 01:10
"curse these trig-loving pirates! " devora mutters as she looks at the map. then, after thinking for a moment, she walks back to the entrance of the secret cave, measuring 48 meters along the way. after performing a calculation, devora walks back to the empty treasure, faces the entrance, and turns a certain number of degrees to her left before walking 89 meters to the treasure. supposing that the angle at the cave entrance is acute and that devora's calculations were correct, how many degrees did she turn?
Answers: 2
question
Mathematics, 22.06.2019 02:00
Estimate the time en route from majors airport (area 1) to winnsboro airport (area 2). the wind is from 340° at 12 knots and the true airspeed is 136 knots. magnetic variation is 5° east.
Answers: 2
question
Mathematics, 22.06.2019 03:00
Which rotation about its center will carry a regular hexagon onto itself
Answers: 3
question
Mathematics, 22.06.2019 03:30
In 2000 the average price of a football ticket was $48.28. during the next 4 years, the proce increased an average of 6% each year.a) write a model giving the average price (p), in dollars, of a ticket (t) in years after 2000.b) graph the model. estimate the year when the average ticket price was about $60
Answers: 1
You know the right answer?
3. The Fine Threads Company produces sleeveless and regular t-shirts. It takes 1 hour to produce eac...
Questions
question
Mathematics, 14.04.2021 02:40
question
Mathematics, 14.04.2021 02:40
question
Mathematics, 14.04.2021 02:40
question
Mathematics, 14.04.2021 02:40
question
Mathematics, 14.04.2021 02:40
Questions on the website: 13722363