subject
Mathematics, 23.09.2021 08:10 TheJanko4526

! Required information
M4-10 to M4-12
Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product cost.
Activity Cost Pools
Machining
Setup
Quality control
Estimated
Total Cost Estimated cost Driver
$581,400 19,000 machine hours
95, 175 470 batches
147,200 920 inspections
M4-11 (Algo) Assigning Costs Using Activity Rates (LO 4.4)
Suppose the Speedy boat requires 2,740 machine hours, 100 batches, and 300 inspections. Using the activity rates, determine the
amount of overhead assigned to the Speedy product line. (Round your intermediate calculations to 2 decimal places and your final
answers to the nearest dollar amount.)
Allocated Overhead
Cost Pool
Machining
Setup Costs
Quality Control
Total Overhead
$
0

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 21:20
Do you mind if you guys me with this question i’m on number 8
Answers: 1
question
Mathematics, 21.06.2019 21:30
Find the volume of the solid obtained by rotating the region enclosed by the curves y=1x and y=7^-x about the x-axis. (use symbolic notation and fractions where needed.) volume =
Answers: 3
question
Mathematics, 21.06.2019 23:00
Using only odd number for numerators write two different subtraction problems that have a difference of 3/4
Answers: 1
question
Mathematics, 21.06.2019 23:30
Savannah had 40 iris blooms last year this year she had 15% more iris blooms how many more hours blooms did savannah have this year
Answers: 1
You know the right answer?
! Required information
M4-10 to M4-12
Lakeside Inc. manufactures four lines of remote...
Questions
question
Social Studies, 22.11.2019 21:31
Questions on the website: 13722367