How do I find the maximum number of hours that the completion time for a critical activity (float/slack time=0) can be reduced without affecting the critical path of a project?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
Which undefined geometric term is described as a location on a coordinate plane that is designed by an ordered pair (x,y) ?
Answers: 1
question
Mathematics, 21.06.2019 18:00
Plz determine whether the polynomial is a difference of squares and if it is, factor it. y2 – 196 is a difference of squares: (y + 14)2 is a difference of squares: (y – 14)2 is a difference of squares: (y + 14)(y – 14) is not a difference of squares
Answers: 1
question
Mathematics, 21.06.2019 18:00
The chs baseball team was on the field and the batter popped the ball up. the equation b(t)=80t-16•16+3.5 represents the height of the ball above the ground in feet as a function of time in seconds. how long will the catcher have to get in position to catch the ball before it hits the ground? round to the nearest second
Answers: 3
question
Mathematics, 21.06.2019 19:30
When 142 is added to a number the result is 64 more then 3 times the number. option 35 37 39 41
Answers: 2
You know the right answer?
How do I find the maximum number of hours that the completion time for a critical activity (float/sl...
Questions
question
Mathematics, 22.05.2021 08:40
question
Mathematics, 22.05.2021 08:40
question
Social Studies, 22.05.2021 08:40
question
Mathematics, 22.05.2021 08:40
question
Mathematics, 22.05.2021 08:40
Questions on the website: 13722363