subject
Mathematics, 30.08.2021 18:10 jpaintballer1

a manufacturing company wants to produce 350 items per hour. the current production fluctuates between 40 items above and 40 items below the desired production rate. find the lower and upper production rates

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
If there is no real number solution to the quadratic equation x^2+2x+c=0 what is a possible value of c? 1 -2 0 3
Answers: 2
question
Mathematics, 21.06.2019 17:20
Solve -2(4y + 6) = 52. 5 -5 8 -8 and !
Answers: 1
question
Mathematics, 21.06.2019 23:10
Use the distance formula to find the distance between (-3,5) and (3,1)
Answers: 1
question
Mathematics, 21.06.2019 23:30
Side xy of triangle xyz is extended to point w, creating a linear pair with ∠wyz and ∠xyz. measure of an exterior angle what is the value of x? 64 80 100 180
Answers: 2
You know the right answer?
a manufacturing company wants to produce 350 items per hour. the current production fluctuates betwe...