subject
Mathematics, 03.08.2021 21:10 clipsyden

Suppose that 10% of all steel shafts produced by a process are nonconforming but can be reworked (rather than having to be scrapped). Consider a random sample of 200 shafts, and let X denote the number among these that are nonconforming and can be reworked. What is the (approximate) probability that X is: a. Less than 30?
b. Between 15 and 25 (inclusive)?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
1. what expression would be the same as 6x+x+0 2. find the prime factorization of 60 3. write the expression for 6 + x in words.
Answers: 3
question
Mathematics, 21.06.2019 19:00
Which table represents a linear function? i'll give brainliest to first answer ^'^
Answers: 1
question
Mathematics, 21.06.2019 22:10
Gravel is being dumped from a conveyor belt at a rate of 25 ft3/min, and its coarseness is such that it forms a pile in the shape of a cone whose base diameter and height are always equal. how fast is the height of the pile increasing when the pile is 14 ft high? (round your answer to two decimal places.) ft/min
Answers: 3
question
Mathematics, 22.06.2019 02:30
Find the difference in area between the circle and the triangle. click on the answer until the correct answer is showing.possible answers: a = 4 pi - 8a = 9 pi - 9/2 √3a = 16/3 pia = 16a = 27 pi
Answers: 1
You know the right answer?
Suppose that 10% of all steel shafts produced by a process are nonconforming but can be reworked (ra...
Questions
question
Mathematics, 24.06.2019 23:10
Questions on the website: 13722361