The estimated project completion times ( days) for the Safaricom PLC Marketing research Assignment problem is as follows; REGION
PROJECT LEADER 1 2 3
Muthoni 10 15 9
Oduor 9 18 5
Toroitich 6 14 3

Required:
1. Draw a network model for the project .
2. Develop the objective function
3. Conduct an optimal assignment of the three project leaders to the three regions using the Hungarian approach.
4. Comment on the results​

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
Afamily has five members. a mom, a dad, two sisters, & a brother. the family lines up single file. what is the probabillity that the mom is at the front of the line
Answers: 1
question
Mathematics, 21.06.2019 23:00
Rob filled 5 fewer plastic boxes with football cards than basketball cards. he filled 11 boxes with basketball cards.
Answers: 1
question
Mathematics, 21.06.2019 23:30
An engineer scale model shows a building that is 3 inches tall. if the scale is 1 inch = 600 feet, how tall is the actual building?
Answers: 3
question
Mathematics, 22.06.2019 01:30
(01.03 mc) which of the following is a step in simplifying the expression x multiplied by y to the power of 2 over x to the power of negative 3 multiplied by y to the power of 3, the whole to the power of negative 4. select one: a. x to the power of negative 4 multiplied by y to the power of negative 2, the whole over x to the power of negative 7 multiplied by y to the power of negative 1. b. x to the power of negative 4 multiplied by y to the power of negative 8, the whole over x to the power of 12 multiplied by y to the power of negative 12. c. x to the power of negative 4 multiplied by y to the power of negative 8, the whole over x to the power of negative 3 multiplied by y to the power of 3. d. x to the power of negative 4 multiplied by y to the power of negative 2, the whole over x to the power of negative 3 multiplied by y to the power of 3.
Answers: 3
You know the right answer?
The estimated project completion times ( days) for the Safaricom PLC Marketing research Assignment p...
Questions
question
French, 29.10.2020 15:50
question
Mathematics, 29.10.2020 15:50
question
Mathematics, 29.10.2020 15:50
question
Mathematics, 29.10.2020 15:50
question
Mathematics, 29.10.2020 15:50
Questions on the website: 13722363