subject
Mathematics, 24.06.2021 02:50 907to760

An oil-drilling rig has dug a hole to a depth of -60 ft. after one full day and night of continuous use. The rate of the rig stayed constant over that time.
Part A: The rig will be used to dig a second hole with a depth of -150 ft. at the same rate as
before. How many hours will the rig take to complete digging the hole?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:20
Aline passes through (1,-5) and(-3,7) write an equation for the line in point slope form rewrite the equation in slope intercept form
Answers: 1
question
Mathematics, 21.06.2019 20:30
Which expression demonstrates the use of the commutative property of addition in the first step of simplifying the expression (-1+i)+(21+5i)+0
Answers: 2
question
Mathematics, 21.06.2019 22:40
The value of x in this system of equations is 1. 3x + y = 9 y = –4x + 10 substitute the value of y in the first equation: combine like terms: apply the subtraction property of equality: apply the division property of equality: 3x + (–4x + 10) = 9 –x + 10 = 9 –x = –1 x = 1 what is the value of y?
Answers: 1
question
Mathematics, 21.06.2019 23:20
Point r divides in the ratio 1 : 5. if the coordinates of e and f are (4, 8) and (11, 4), respectively, what are the coordinates of r to two decimal places?
Answers: 2
You know the right answer?
An oil-drilling rig has dug a hole to a depth of -60 ft. after one full day and night of continuous...
Questions
question
Mathematics, 27.12.2019 22:31
question
Biology, 27.12.2019 22:31
Questions on the website: 13722363