The time it takes to build a house (T), varies directly with the floor area (A), and inversely with the number of workers (W). What is the equation that models this situation?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
I’m which figure is point g an orthocenter
Answers: 1
question
Mathematics, 21.06.2019 20:30
Find the solution(s) to the system of equations. select all that apply y=x^2-1 y=2x-2
Answers: 2
question
Mathematics, 21.06.2019 20:50
What is the greatest number of parts of a circle that can be formed by cutting the circle with 7 straight cuts? (note: the parts do not have to be equal in size)
Answers: 3
question
Mathematics, 21.06.2019 23:40
Solve these problems: 1.what is the perimeter of an equilateral triangle with sides measuring 6cm? 2. a regular pentagon has sides measuring 3.2 cm. what is its perimeter? 3. a regular decagon has sides of 3.5mm . what is it’s perimeter? 4. a regular octagon has a perimeter of 64cm. what is the length of one of the sides? 5. a regular hexagon has a perimeter of 72mm . what is the length of one of the sides? 6. what is the perimeter of a rhombus with sides measuring 11m?
Answers: 2
You know the right answer?
The time it takes to build a house (T), varies directly with the floor area (A), and inversely with...