subject
Mathematics, 02.06.2021 02:00 Amholloway13

A process engineer is implementing a quality assurance system on a breakfast cereal production line. A new sensor is installed on the line that tests the weight of the filled boxes and rejects any product outside the correct package weight. Historically, 90% of the product manufactured on this line is within the correct weight range. The sensor rejects boxes of incorrect weight 98% of the time. The sensor rejects boxes of correct weight 1% of the time. What is the probability that a correct weight box of cereal will get rejected by the sensor

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
1. what is the formula for finding the vertical distance between two points on a coordinate plane?
Answers: 1
question
Mathematics, 21.06.2019 18:20
What is the solution set of the quadratic inequality x2- 5< 0? o {xl-55x55{x- 155x55){xl -55x5 15){x1 - 15 sx5/5)
Answers: 2
question
Mathematics, 21.06.2019 19:10
Which ordered pair is a solution of the equation? y + 5 = 2(2+1) choose 1 answer ® only (5,10 ® only (-1,-5) © both (5, 10) and (-1,-5) 0 neither
Answers: 1
question
Mathematics, 21.06.2019 21:30
The table shows the number of students who signed up for different after school activities. activity students cooking 9 chess 4 photography 8 robotics 11 select the true statements about the information in the table.
Answers: 2
You know the right answer?
A process engineer is implementing a quality assurance system on a breakfast cereal production line....
Questions
question
Business, 08.07.2019 21:50
Questions on the website: 13722363