subject
Mathematics, 19.05.2021 03:30 pmdare2551

Problem: How many cubic yards of concrete must be ordered to pour the section below?
1 ft
18 ft
1.5 ft


Problem: How many cubic yards of concrete must be ordered to pour the section

below?
1 ft 
18 ft

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Turner's mom measured his room to see how long the wallpaper border needed to be. if two walls are 15 feet long and two walls are 12 feet long, how long should the strip of border be cut?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Anormally distributed data set has a mean of 176.3 and a standard deviation of 4.2. what is the approximate z-score for the data value of 167.9? 2.00 −2.00 8.4 −8.4
Answers: 2
question
Mathematics, 21.06.2019 20:00
Another type of subtraction equation is 16-b=7. explain how you would sole this equation then solve it.
Answers: 2
question
Mathematics, 21.06.2019 20:00
Two line segments are shown in the figure below. suppose that the length of the line along the x-axis is 6, and the length of the hypotenuse of the triangle is 10. what is the equation of the hypotenuse line (shown in red, below)?
Answers: 3
You know the right answer?
Problem: How many cubic yards of concrete must be ordered to pour the section below?
1 ft
Questions
question
Mathematics, 30.10.2020 17:30
question
Social Studies, 30.10.2020 17:30
question
Chemistry, 30.10.2020 17:30
question
Mathematics, 30.10.2020 17:30
Questions on the website: 13722367