subject
Mathematics, 17.05.2021 05:00 lulu5563

The donaldson furniture company produces three types of rocking​ chairs: the​ children's model, the standard​ model, and the executive model. each chair is made in three​ stages: cutting,​ construction, and finishing. stage ​children's standard executive cutting 5 hr 4 hr 7 hr construction 3 hr 2 hr 5 hr finishing 2 hr 2 hr 4 hr the time needed for each stage of each chair is given in the chart. during a specific week the company has available a maximum of 166 hours for​ cutting, 102 hours for​ construction, and 82 hours for finishing. determine how many of each type of chair the company should make to be operating at full capacity.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 20.06.2019 18:04
An equation is shown below: 3(4x − 2) = 1 which of the following correctly shows the first two steps to solve this equation?
Answers: 2
question
Mathematics, 21.06.2019 14:00
Me. drysdale earned 906.25 in interest in one year on money that he had deposited in his local bank if the bank paid an interest rate of 6.25% how much money did mr. drysdale deposit
Answers: 3
question
Mathematics, 21.06.2019 14:30
The perimiter of a rectangle is 70 inches the legneth of the rectangle is 5 less than 3 times the width of the rectangle what is the width of the rectangle
Answers: 3
question
Mathematics, 21.06.2019 15:00
The radius of the base of a cylinder is 10 centimeters, and its height is 20 centimeters. a cone is used to fill the cylinder with water. the radius of the cone's base is 5 centimeters, and its height is 10 centimeters.
Answers: 1
You know the right answer?
The donaldson furniture company produces three types of rocking​ chairs: the​ children's model, the...
Questions
question
Mathematics, 22.08.2020 08:01
question
Mathematics, 22.08.2020 08:01
question
Mathematics, 22.08.2020 08:01
Questions on the website: 13722363