subject
Mathematics, 29.04.2021 16:50 imhorribleatmath90

Y = 2x+10 shows the price, y, for x hours of contractor labor. How much for 10 hours of labor?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
How do the definitions, properties, and postulates you've learned about line segments, parallel lines, and angles to define the shapes of polygons
Answers: 1
question
Mathematics, 21.06.2019 20:20
Which of the following best describes the delian problem?
Answers: 3
question
Mathematics, 22.06.2019 00:00
Aspacecraft can attain a stable orbit 300 kilometers above earth if it reaches a velocity of 7.7 kilometers per second. the formula for a rocket's maximum velocity v in kilometers per second is vequalsminus0.0098tplusc ln upper r, where t is the firing time in seconds, c is the velocity of the exhaust in kilometers per second, and r is the ratio of the mass of the rocket filled with fuel to the mass of the rocket without fuel. find the velocity of a spacecraft whose booster rocket has a mass ratio of 20, an exhaust velocity of 2.1 km/s, and a firing time of 15 s. can the spacecraft achieve a stable orbit 300 km above earth?
Answers: 3
question
Mathematics, 22.06.2019 03:30
Multiply the polynomials (x+3)(x^2-6x+5)
Answers: 1
You know the right answer?
Y = 2x+10 shows the price, y, for x hours of contractor labor. How much for 10 hours of labor?...
Questions
Questions on the website: 13722367