subject
Mathematics, 27.04.2021 03:30 taterbug3859

If the silver sheet costs $9.75 per cm2, the copper sheet costs $3.25 per cm2, and the stone costs $1.75 per cm2, what is the materials cost for the brooch?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:20
Find the image of a(4, -2) after it is reflected over the line y= 2, then reflected over the line x = 2. (-8,6) o (0.-2) o (0,6) (-8, -2)
Answers: 1
question
Mathematics, 21.06.2019 17:00
The angle of a triangle are given as 6x,(x-3), and (3x+7). find x then find the measures of the angles
Answers: 2
question
Mathematics, 21.06.2019 17:30
#1-20 state whether the angles are alternate interior, alternate exterior, vertical, or corresponding angles.
Answers: 2
question
Mathematics, 21.06.2019 18:30
Thales was an ancient philosopher familiar with similar triangles. one story about him says that he found the height of a pyramid by measuring its shadow and his own shadow at the same time. if the person is 5-ft tall, what is the height of the pyramid in the drawing?
Answers: 3
You know the right answer?
If the silver sheet costs $9.75 per cm2, the copper sheet costs $3.25 per cm2, and the stone costs $...
Questions
question
English, 09.11.2020 06:10
question
Physics, 09.11.2020 06:10
question
Mathematics, 09.11.2020 06:10
Questions on the website: 13722363