subject
Mathematics, 23.04.2021 22:40 binks3350

A company found that an experienced surveyor can survey a roadbed in 4 hours. An apprentice surveyor needs 11 hours to survey the same stretch of road. If the two work together
, find how long it takes them to complete the job.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
If you can solve all of these i will give ! - 4% of 190 - 4% of 162.5 - 4% of 140 - a 4% increase from 155.1 - a 4% increase from 159.8
Answers: 2
question
Mathematics, 21.06.2019 20:00
Segment an is an altitude of right δabc with a right angle at a. if ab = 2, squared 5 in and nc = 1 in, find bn, an, ac.
Answers: 2
question
Mathematics, 21.06.2019 23:30
The volume of a box varies directly with its length if a box in the group has a length of 30inches and k=24 what is its volume
Answers: 1
question
Mathematics, 22.06.2019 00:00
Why is x= 4 a solution to the proportion 14/x 56/1 6
Answers: 1
You know the right answer?
A company found that an experienced surveyor can survey a roadbed in 4 hours. An apprentice surveyor...
Questions
question
Mathematics, 29.10.2021 14:00
question
History, 29.10.2021 14:00
question
Mathematics, 29.10.2021 14:00
question
Mathematics, 29.10.2021 14:00
Questions on the website: 13722367