Consider an assembly line with 20 stations. each station has a 0.5% probability of making a defect. at the end of the line, an inspection step singles out the defective units. the inspection step catches 80% of all defects. from inspection, units that are deemed to be non-defective are moved to the shipping department. if a defect is found at inspection, it is sent to the rework department. rework fixes about 95% of the defective units. units are directly shipped from the rework department with no further inspection taking place. what is the probability that a unit ends up in rework (in decimal form)?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 22.06.2019 00:30
Astudent was asked to find the square of 7x+3. the student quickly wrote (7x+3)^3= 49x^2+9. identify the student's error and provide the correct answer.
Answers: 3
question
Mathematics, 22.06.2019 01:00
Asandwich shop has 18 tables. each table seats up to 4 people. to find the greatest number of people that can be seated, you can solve p4 ≤ 18. which step is the best way to solve the inequality? plz asap i repeat plz
Answers: 2
question
Mathematics, 22.06.2019 02:30
The first and second steps to solve the equation 3x/5 + 5 = 20.are shown below 3x/5 + 5 - 5 = 20 - 5 3x/5 (5/3) = 15 (5/3)a.addition property of equality b.subtraction property of equalityc.multiplication property of equalityd.division property of equality
Answers: 3
question
Mathematics, 22.06.2019 04:30
40 points which is the equation of a line perpendicular to the line with the equation: y = 1/4x + 2 a : y = -4x - 7 b : y = 4x + 2 c : y = 1/4x - 1/2 d : y = -1/4x + 3
Answers: 1
You know the right answer?
Consider an assembly line with 20 stations. each station has a 0.5% probability of making a defect....
Questions
question
Mathematics, 12.10.2020 21:01
question
English, 12.10.2020 21:01
question
Mathematics, 12.10.2020 21:01
question
Mathematics, 12.10.2020 21:01
Questions on the website: 13722361