Mathematics, 20.08.2019 07:30 JamesLachoneus
The first painter can finish a paint job in two hours. the second painter can finish the same job in 8 hours. how long will it take them to finish the job if they are working together?
Answers: 1
Mathematics, 21.06.2019 18:00
What is the value of x in the equation 2(x-4) = 4(2x + 1)?
Answers: 1
Mathematics, 21.06.2019 21:00
Gabriel determined that his total cost would be represented by 2.5x + 2y – 2. his sister states that the expression should be x + x + 0.5x + y + y – 2. who is correct? explain.
Answers: 2
Mathematics, 21.06.2019 21:00
*let m∠cob = 50°30’, m∠aob = 70° and m∠aoc = 20°30’. could point c be in the interior of ∠aob? why?
Answers: 1
Mathematics, 21.06.2019 21:30
Three friends went on a road trip from phoenix, az, to san diego, ca. mark drove 50 percent of the distance. jason drove 1/8 of the distance. andy drove the remainder of the distance. 1. andy thinks he drove 1/4 of the distance from phoenix, az, to san diego, ca. is andy correct? 2. the distance from phoenix, az, to san diego, ca, is 360 miles. how many miles did each person drive? 3. solve the problem. what is the answer in total?
Answers: 3
The first painter can finish a paint job in two hours. the second painter can finish the same job in...
History, 25.01.2020 06:31
Mathematics, 25.01.2020 06:31
Mathematics, 25.01.2020 06:31