subject
Mathematics, 02.09.2019 06:10 Misterasomoe

One of mr. grayson’s customers, zenani, is creating an art wall on which she will display some art in triangular frames. she wants three frames, each in the shape of a right triangle. (a) for the first frame, zenani already has two wooden pieces that are 13 in. and 16 in. long. zenani says that since she wants the frame to be a right triangle, there’s only one possible measurement for the last piece of wood. is zenani right? if so, what is that last measurement? if not, explain why not and give all possible measurements for the last wood piece. round to the nearest tenth. (b) for the second frame, zenani asks mr. grayson to double the measurements of the first triangular frame to make a new frame in the shape of a right triangle. will zenani’s strategy work for the second frame? explain why or why not. (c) for the third frame, zenani asks mr. grayson to add the same measurement to each of the sides of the original triangle frame to make a new frame in the shape of a right triangle. will zenani’s strategy work for the third frame? explain why or why not. and you

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Two blends of tea are mixed to make a blend that will be sold at the fair. black tea sells for $2.20 per pound and orange pekoe tea sells for $3.00 per pound. how much of each should be used to obtain a 4lb blend selling for $2.50 per pound?
Answers: 1
question
Mathematics, 21.06.2019 20:30
Write two point-slope equations for the line passing through the points (6, 5) and (3, 1)
Answers: 1
question
Mathematics, 21.06.2019 21:30
Joanie wrote a letter that was 1 1/4 pages long. katie wrote a letter that was 3/4 page shorter then joagies letter. how long was katies letter
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
One of mr. grayson’s customers, zenani, is creating an art wall on which she will display some art i...
Questions
question
History, 23.02.2021 23:20
question
Mathematics, 23.02.2021 23:20
question
Mathematics, 23.02.2021 23:20
question
Mathematics, 23.02.2021 23:20
question
History, 23.02.2021 23:20
question
Mathematics, 23.02.2021 23:20
question
Chemistry, 23.02.2021 23:20
question
History, 23.02.2021 23:20
question
Mathematics, 23.02.2021 23:20
Questions on the website: 13722363