subject
Mathematics, 01.09.2019 10:30 DiamNeli

If it takes 4 men 6 hours to repair a road, how long will it take 3 men to do the job if they work at the same rate ? a) 5 hours b) 6 hours c) 8 hours d) 9 hours

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Suppose a triangle has two sides of length 32 and 35, and that the angle between these two sides is 120°. which equation should you solve to find the length of the third side of the triangle?
Answers: 1
question
Mathematics, 21.06.2019 15:30
The tiles below are pieces of a normal ecg tracing representing a little less than two heartbeats at a resting rate of 80 bpm. arrange the tiles in their correct order. rank from first to last. do not overlap any tiles.
Answers: 1
question
Mathematics, 22.06.2019 00:30
For the sequence [tex]a_{n} = 2n/(n+1)[/tex], what is the value of [tex]a_{10}[/tex]
Answers: 2
question
Mathematics, 22.06.2019 03:00
How much would it be worth in 5, 10, 20 years
Answers: 1
You know the right answer?
If it takes 4 men 6 hours to repair a road, how long will it take 3 men to do the job if they work a...
Questions
Questions on the website: 13722363