subject
Mathematics, 21.10.2019 22:30 jjmage2206

The board of directors of a company knows that the probability that the carbon emission from the company’s manufacturing unit is exceeding the permissible level is 35%. a consultant is hired to use a carbon footprint calculator to test for the emission level. the accuracy of this test is said to be 85%.

what is the probability that the manufacturing unit has carbon emission beyond the permissible emission level and the test predicts this?
0.2975

0.0525
0.0975
0.5525
0.6325

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
The area of a 25-inch tv screen is 300 square inches. the area of a 40-inch tv screen is 768 square inches. the are of the smaller screen is what percent of the area of the larger screen?
Answers: 3
question
Mathematics, 21.06.2019 21:00
Helena lost her marbles. but then she found them and put them in 44 bags with mm marbles in each bag. she had 33 marbles left over that didn't fit in the bags.
Answers: 3
question
Mathematics, 21.06.2019 23:20
For which pairs of functions is (f•g)(x)=12x? f(x)=3-4x and g(x)=16x-3 f(x)=6x2 and g(x)= 2/x f(x)= and g(x) = 144x f(x)=4x and g(x) =3x
Answers: 1
question
Mathematics, 22.06.2019 01:30
Apasta salad was chilled in the refrigerator at 35° f overnight for 9 hours. the temperature of the pasta dish dropped from 86° f to 38° f. what was the average rate of cooling per hour?
Answers: 3
You know the right answer?
The board of directors of a company knows that the probability that the carbon emission from the com...
Questions
question
Mathematics, 11.03.2021 18:10
question
Mathematics, 11.03.2021 18:10
question
Mathematics, 11.03.2021 18:10
question
Mathematics, 11.03.2021 18:10
Questions on the website: 13722363