If a project will take 35 employees 2,940 hours to complete, how many hours will each employee have to work? a. 45 b. 84 c. 76 d. 55

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
At the olympic games, many events have several rounds of competition. one of these events is the men's 100-meter backstroke. the upper dot plot shows the times (in seconds) of the top 8 finishers in the final round of the 2012 olympics. the lower dot plot shows the times of the same 8 swimmers, but in the semifinal round. which pieces of information can be gathered from these dot plots? (remember that lower swim times are faster.) choose all answers that apply: a: the swimmers had faster times on average in the final round. b: the times in the final round vary noticeably more than the times in the semifinal round. c: none of the above.
Answers: 2
question
Mathematics, 21.06.2019 19:40
Suppose that 3% of all athletes are using the endurance-enhancing hormone epo (you should be able to simply compute the percentage of all athletes that are not using epo). for our purposes, a “positive” test result is one that indicates presence of epo in an athlete’s bloodstream. the probability of a positive result, given the presence of epo is .99. the probability of a negative result, when epo is not present, is .90. what is the probability that a randomly selected athlete tests positive for epo? 0.0297
Answers: 1
question
Mathematics, 21.06.2019 20:00
With finding limits of multi variable !
Answers: 1
question
Mathematics, 21.06.2019 20:00
The boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a) e = 2b - 212 b) b = 2e - 212 c) e = -2b + 212 d) b = -2e + 212
Answers: 1
You know the right answer?
If a project will take 35 employees 2,940 hours to complete, how many hours will each employee have...
Questions
question
Mathematics, 14.01.2020 10:31
question
Mathematics, 14.01.2020 10:31
question
Mathematics, 14.01.2020 10:31
Questions on the website: 13722360