subject
Mathematics, 29.01.2020 14:48 srshelton

Ateam of 15 workers can do a job in 7 hours. how long would this work take if the team has 35 people?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Which answer is the solution set to the inequality |x|< 9? a. x< -9 or x> 9 b. x> -9 and x< 9 c. x> -9 or x< 9 d. x< 9 and x< 9
Answers: 1
question
Mathematics, 21.06.2019 16:10
What is the point-slope equation of a line with slope -5 that contains the point (6,3)
Answers: 1
question
Mathematics, 21.06.2019 17:00
Aswimming pool is a rectangle with semicircles on the end. the rectangle is 12 meters wide and 30 meters long. the diameter and width of the swimming pool are equal. sketch and label an overhead diagram of the swimming pool. find the area of the swimming pool floor.
Answers: 1
question
Mathematics, 21.06.2019 19:50
The graph shows the distance kerri drives on a trip. what is kerri's speed?
Answers: 3
You know the right answer?
Ateam of 15 workers can do a job in 7 hours. how long would this work take if the team has 35 people...
Questions
question
Social Studies, 21.06.2021 07:00
question
Mathematics, 21.06.2021 07:00
question
Mathematics, 21.06.2021 07:00
Questions on the website: 13722367