Mathematics, 19.11.2019 17:31 001035783

Working together, it takes two computers
20
minutes to send out a company's email. if it takes the slower computer
45
minutes to do the job on its own, how long will it take the faster computer to do the job on its own?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Find the height of a square pyramid that has the volume of 32 ft.³ and a base lengthof 4 feet
Answers: 1
question
Mathematics, 21.06.2019 17:00
The magnitude, m, of an earthquake is defined to be m=log l/s, where i is the intensity of the earthquake (measured by the amplitude of the seismograph wave) and s is the intensity of a “standard” earthquake, which is barely detectable. what is the magnitude of an earthquake that is 1,000 times more intense than a standard earthquake? use a calculator. round your answer to the nearest tenth.
Answers: 1
question
Mathematics, 21.06.2019 20:00
The rectangle shown has a perimeter of 108 cm and the given area. its length is 6 more than five times its width. write and solve a system of equations to find the dimensions of the rectangle.
Answers: 3
question
Mathematics, 21.06.2019 22:10
If p(a) = 0.70 and p(b) = 0.20, then a and b are independent events if
Answers: 3
You know the right answer?
Working together, it takes two computers
20
minutes to send out a company's email. if i...
Questions
question
Mathematics, 02.03.2021 04:00
question
Mathematics, 02.03.2021 04:00
question
Mathematics, 02.03.2021 04:00
question
History, 02.03.2021 04:00
Questions on the website: 13722361