Mathematics, 31.01.2020 21:49 nmartin1467
Universal pet house sells vinyl doghouse and treated lumber doghouses. it takes the company 5 hours to build a vinyl doghouses and 2 hours to build a treated lumber doghouse. the company dedicates 50 hours every week towards assembling and painting doghouses. it takes an additional hour to paint each vinyl doghouse and an additional 2 hours to assemble each treated lumber doghouse. the company dedicates 30 hours every week towards assembling and paining dog houses.
write a system of equation that represents the production time needed to build each dog house and the production time needed for paining and assembling each dog house. use x to represent the number of vinyl dog houses and y to represent the number of treated lumber dog houses.(just need the answer
build time:
paint/assembly time:
Answers: 2
Mathematics, 21.06.2019 16:30
Which of the following is the correct ratio for converting kilograms to grams
Answers: 3
Mathematics, 21.06.2019 18:00
The base of a triangle exceeds the height by 7 centimeters. if the area is 400 square centimeters, find the length of the base and the height of the triangle.
Answers: 1
Mathematics, 21.06.2019 22:30
Atotal of 766 tickets were sold for the school play. they were either adult tickets or student tickets. there were 66 more student tickets sold than adult tickets. how many adult tickets were sold?
Answers: 1
Mathematics, 21.06.2019 23:00
An elevator travels 310 feet in 10 seconds. at that speed, how far can't his elevator travel in 12 seconds?
Answers: 1
Universal pet house sells vinyl doghouse and treated lumber doghouses. it takes the company 5 hours...
Business, 14.11.2019 17:31
Mathematics, 14.11.2019 17:31
Physics, 14.11.2019 17:31
Mathematics, 14.11.2019 17:31
Social Studies, 14.11.2019 17:31
Mathematics, 14.11.2019 17:31
Social Studies, 14.11.2019 17:31