subject
Mathematics, 11.11.2019 18:31 sandy2597

Aworker takes a random sample of 290 bolts and finds that 29 of them are either too long or too short, thus making them unusable. estimate the number of unusable bolts in a production of 20,000 bolts.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
An advertisement is on a flyer that has a thickness of 8.2 × 10-5 meters. each measurement below is the thickness of a stack of flyers. drag each measurement to the correct stack.
Answers: 2
question
Mathematics, 21.06.2019 22:00
You are standing next to a really big circular lake. you want to measure the diameter of the lake, but you don't want to have to swim across with a measuring tape! you decide to walk around the perimeter of the lake and measure its circumference, and find that it's 400\pi\text{ m}400? m. what is the diameter dd of the lake?
Answers: 3
question
Mathematics, 21.06.2019 23:20
8litres of paint can cover 129.6 m². how much paint is required to paint an area of 243m²?
Answers: 3
question
Mathematics, 22.06.2019 00:00
Why is x= 4 a solution to the proportion 14/x 56/1 6
Answers: 1
You know the right answer?
Aworker takes a random sample of 290 bolts and finds that 29 of them are either too long or too shor...
Questions
Questions on the website: 13722363