subject
Mathematics, 19.09.2019 22:00 kim95207

Paul can install a 300-square-foot hardwood floor in 18 hours. matt can install the same floor in 22 hours. how long would it take paul and matt to install the floor working together?
4 hours
9.9 hours
13.2 hours
30 hours

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
He expression 2(l + w) is used to calculate the perimeter of a rectangle, where l is length and w is width. if the length is fraction 2 over 3 unit and the width is fraction 1 over 3 unit, what is the perimeter of the rectangle in units? fraction 2 over 3 unit 1 unit 1fraction 2 over 3 units 2 units
Answers: 3
question
Mathematics, 21.06.2019 17:00
This is different from the first one can someone me
Answers: 1
question
Mathematics, 21.06.2019 19:50
98 point question what is the record for most points in one
Answers: 2
question
Mathematics, 22.06.2019 01:00
Find the value of the variable and the length of each chord for #5 and #6.
Answers: 1
You know the right answer?
Paul can install a 300-square-foot hardwood floor in 18 hours. matt can install the same floor in 22...
Questions
question
Mathematics, 17.11.2020 20:30
question
Mathematics, 17.11.2020 20:30
question
Mathematics, 17.11.2020 20:30
question
Mathematics, 17.11.2020 20:30
question
Social Studies, 17.11.2020 20:30
question
English, 17.11.2020 20:30
Questions on the website: 13722366