Mathematics, 05.10.2019 23:30 mccartney33
at roberto’s construction site, the crew can frame a wall in 35 minutes and frame the opening for a door in 21 minutes. the crew needs 9 loads of materials for each wall and 13 loads of materials for each door. one day the crew worked for 595 minutes. and used 267 loads of materials. which system of equations could be used to find the number of doors. d. and walls. w, they framed?
a 35w + 9w = 595 35d + 13d = 267
b 21w + 35d = 595 9w+ 13d= 267
c 35w + 21d = 595 13w+ 9d = 267
d 35w + 21d = 595 9w+ 13d= 267
Answers: 1
Mathematics, 21.06.2019 17:00
The angle of a triangle are given as 6x,(x-3), and (3x+7). find x then find the measures of the angles
Answers: 2
Mathematics, 21.06.2019 18:40
This stem-and-leaf plot represents the heights of the students on ralph's basketball team. one student's height is missing from the plot. if the mean height of all the students on the team is 61 inches, what is the missing height? a. 55 in. b. 59 in. c. 61 in. d. 65 in.
Answers: 2
Mathematics, 21.06.2019 20:00
Given ab and cb are tangents of p, and m =10°. what is the measure of abp?
Answers: 3
Mathematics, 21.06.2019 22:00
Asquare and an equilateral triangle have the same perimeter. each side the triangle is 4 inches longer than each side of the square. what is the perimeter of the square
Answers: 1
at roberto’s construction site, the crew can frame a wall in 35 minutes and frame the opening for a...
Social Studies, 07.05.2022 03:10
Mathematics, 07.05.2022 03:10
History, 07.05.2022 03:30
Geography, 07.05.2022 03:30
Arts, 07.05.2022 03:50
English, 07.05.2022 04:30
Business, 07.05.2022 05:00
Mathematics, 07.05.2022 05:00