Afactory is currently running at 85% of its original capacity, and management is considering upgrading the equipment.

the upgrade will take 6 months, during which time the factory will not run at all. once complete, the factory’s output will increase to 120% of the original capacity. after how long would the upgraded factory’s production match the current 85% production? in other words, how long will it take for the factory to make up for the loss of 6 months?

(hint: the problem can be solved using a system of equations, but any method is acceptable as long as it is justified. if you get stuck, try letting the factory’s original output be 100 units per month.)

serious answers only. i would appreciate work shown!

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:50
A3-dimensional figure has a square base and 4 lateral faces that meet at a point. explain the difference between the cross sections when a slice is made perpendicular to the base through the vertex, and when a slice is made perpendicular to the base and not through the vertex
Answers: 2
question
Mathematics, 22.06.2019 02:20
Combine like terms to create an equivalent expression. make sure to simplify coefficients and constants as well. -6/5-2/3v+4/15+1/3v
Answers: 2
question
Mathematics, 22.06.2019 02:30
Ablue whale traveled 3112 miles in 214hours. what was the whale's rate in yards per hour? (1 mile = 1,760 yards)
Answers: 1
question
Mathematics, 22.06.2019 11:30
Which triangle congruence theorem could be used to immediately show 1=2 with no additional steps? sss,sas,asa,hl
Answers: 1
You know the right answer?
Afactory is currently running at 85% of its original capacity, and management is considering upgradi...
Questions
question
Mathematics, 12.08.2020 04:01
question
Mathematics, 12.08.2020 04:01
Questions on the website: 13722367