best vision is revamping its assembly lines to improve efficiency. as shown below, there are 10 steps to assembling a television set.

if best needs to produce 120 televisions in a 40-hour work week, how should the line be balanced? given that one worker is assigned to each workstation, how many workers are required to operate the line? what is the efficiency of the line?

if demand for televisions is reduced to 100 sets per 40-hour week, how many workers will be needed to man the line? re-balance the line and re-calculate its efficiency.

task

precedence

time (min)

a

none

8

b

a

4

c

a

7

d

a

3

e

b

7

f

c, e

11

g

d

2

h

g

8

i

f, h

5

j

i

7

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
The sketch shows two parallel lines cut by a transversal. angle 2 2 is 36° 36 ° . what is the measure of angle 8 8 ?
Answers: 1
question
Mathematics, 21.06.2019 17:00
Parks is wearing several rubber bracelets one third of the bracelets are tie dye 1/6 are blue and 1/3 of the remainder are camouflage if park swears to camouflage bracelets how many bracelets does he have on
Answers: 2
question
Mathematics, 21.06.2019 21:00
Bo is buying a board game that usually costs bb dollars. the game is on sale, and the price has been reduced by 18\%18%. what could you find the answer?
Answers: 1
question
Mathematics, 21.06.2019 21:10
Indicate the formula for the following conditions: p^c(n,r)=
Answers: 3
You know the right answer?
Task

precedence

time (min)

best vision is revamping its assembly...
Questions
question
History, 16.10.2020 09:01
question
Mathematics, 16.10.2020 09:01
question
Advanced Placement (AP), 16.10.2020 09:01
question
Mathematics, 16.10.2020 09:01
question
Mathematics, 16.10.2020 09:01
question
Mathematics, 16.10.2020 09:01
Questions on the website: 13722367